FIRECON was incorporated in the year 1987 by Mr.  A. K. Sarkar as a proprietorship unit with the primary aim of  rendering Consultancy Services in the field of:FIRE PREVENTION, FIRE DETECTION & FIRE PROTECTION SYSTEMS

CIVIL & STRUCTURAL

FIRECON has designed and implemented following facilities:

  • INDUSTRIAL BUILDINGS.
  • INDUSTRIAL SHEDS.
  • RAIL WAGON GANTRY FOR POL LOADING/UNLOADING.
  • RAIL WAGON GANTRY FOR LPG LOADING/UNLOADING.
  • BLAST RESISTANCE CONTROL ROOM BUILDING.
  • TECHNOLOGICAL STRUCTURE (MULTI-STORIED).
  • MOUNDS TO HOUSE BULLETS (MSV).

All designs are validated through STADD-PRO and FABRICATION DRAWINGS are developed through TEKLA SOFTWARE.

ELECTRICAL SYSTEM

FIRECON has designed and implemented following systems:

  • 33 kVA RECEIVING STATION.
  • 11 kVA RECEIVING STATION.
  • H.T. PANELS WITH RELATED CABLING.
  • L.T. PANELS (PCC & PMCC) WITH RELATED CABLING.
  • SPECIALLY DESIGNED FIRE PROTECTION PANELS.

All designs are validated through E-TAP ANALYSIS and ILLUMINATION DRAWINGS are through DIALux SOFTWARE.

FIRE DETECTION & FIRE PROTECTION

FIRECON has designed and implemented following Systems.

  • FIRE WATER PUMPING SYSTEM WITH STORAGE.
  • FIRE WATER NETWORK WITH HYDRANTS & MONITORS.
  • HIGH VELOCITY WATER SPRAY SYSTEM.
  • MEDIUM VELOCITY WATER SPRAY SYSTEM.
  • SPRINKLER SYSTEM.
  • FOAM POURING SYSTEM.
  • FOAM SPRINKLER SYSTEM.
  • RIM SEAL PROTECTION SYSTEM.
  • CLEAN AGENT SYSTEM.
  • INTELLIGENT FIRE DETECTION AND ALARM SYSTEM.
  • FLAME DETECTION & GAS DETECTION SYSTEM.

All designs are validated through PIPENET SOFTWARE for compliance with OISD STANDARDS & NFPA RECOMMENDATIONS.

INSTRUMENTATION & AUTOMATION SYSTEM

FIRECON has designed and implemented following Systems:

  • TERMINAL AUTOMATION SYSTEM (TAS) FOR POL TERMINAL/INSTALLATION/DEPOT.
  • TERMINAL AUTOMATION SYSTEM (TAS) FOR LPG TERMINAL/INSTALLATION/DEPOT.
  • AUTOMATION OF FIRE PROTECTION SYSTEM FOR POL TERMINAL/INSTALLATION/DEPOT.
  • AUTOMATION OF FIRE PROTECTION SYSTEM FOR LPG TERMINAL/INSTALLATION/DEPOT.
  • TANK FARM MANAGEMENT SYSTEM.
  • DEVELOPMENT OF GRAPHIC PAGES AND SYSTEM ARCHITECTURE.
  • AUTOMATION OF MARINE UNLOADING FACILITY AT JETTY FOR UNLOADING POL PRODUCTS AND PROPANE/BUTANE/LPG.

All designs is validated with P&I DIAGRAM as well as CAUSE & EFFECT DIAGRAM.

PRODUCT (LPG) HANDLING SYSTEM

FIRECON has designed and implemented following facilities:

  • REFRIGERATED TERMINAL FOR IMPORTING PROPANE & BUTANE AND PRODUCING LPG.
  • PRESSURIZED TERMINAL FOR IMPORTING LPG.
  • CROSS COUNTRY PIPELINE FOR PROPANE/BUTANE/LPG TRANSFER.
  • STORAGE SYSTEM – DOUBLE WALL TANKS, SPHERES, BULLETS, MOUNDED STORAGE VESSELS.
  • LPG BOTTLING PLANT.
  • RETICULATION SYSTEM FOR INDUSTRY.
  • RETICULATION SYSTEM FOR RESIDENTIAL COMPLEX.

The System is implemented after the P&I DIAGRAM along with CAUSE & EFFECT DIAGRAM has been subjected to HAZOP STUDY.

PRODUCT (POL) HANDLING SYSTEM

FIRECON has designed and implemented following facilities:

  • COASTAL TERMINAL FOR RECEIVING WHITE OIL & BLACK OIL FROM SHIP AND STORING IN VERTICAL TANKS.
  • POL INSTALLATION FOR RECEIVING WHITE OIL & BLACK OIL THROUGH RAIL WAGON AND STORING IN VERTICAL TANKS.
  • CROSS COUNTRY PIPELINE FOR WHITE OIL.
  • STORAGE SYSTEM – FLOATING ROOF TANKS, CONE ROOF TANKS, DOME ROOF TANKS.
  • PUMPING SYSTEM FOR LOADING IN ROAD TANKERS WITH COMPLETE AUTOMATION.
  • PUMPING SYSTEM FOR LOADING IN RAIL WAGON WITH COMPLETE AUTOMATION.
  • ROAD FED POL DEPOT COMPLETE WITH HORIZONTAL UNDERGROUND TANKS, SUMP PUMPS & ROAD TANKER UNLOADING / LOADING FACILITY.

The System is implemented after the P&I DIAGRAM along with CAUSE & EFFECT DIAGRAM has been subjected to HAZOP STUDY.

STATUTORY APPROVALS

FIRECON has been associated with the following activities:

  • CONSTRUCTION APPROVAL FOR LPG TERMINAL FROM PESO.
  • CONSTRUCTION APPROVAL FOR LPG BOTTLING PLANT FROM PESO.
  • CONSTRUCTION APPROVAL FOR CROSS-COUNTRY PIPELINE FROM PESO.
  • CONSTRUCTION APPROVAL FOR POL TERMINAL FROM PESO.
  • STORAGE LICENSE FOR MOUNDED BULLET FROM PESO.
  • CYLINDER FILLING LICENSE AND FILLED CYLINDER STORAGE LICENSE FROM PESO.
  • STORAGE LICENSE FOR WHITE OIL FROM PESO.
  • PERMISSION FOR COMMISSIONING CROSS-COUNTRY PIPELINE FROM PESO.
  • PERMISSION FOR BULK LOADING OF LPG IN ROAD TANKERS FROM PESO.
  • PERMISSION FOR BULK LOADING OF LPG IN RAIL WAGONS FROM PESO.
TURNKEY CONSULTANCY

FIRECON has rendered following services for implementation of any facility from CONCEPT to COMMISSIONING

  • CONCEPT ENGINEERING.
  • DEVELOPMENT OF PROJECT REPORT.
  • DEVELOPMENT OF CAPEX & OPEX.
  • BASIC/FEED ENGINEERING.
  • PMC SERVICES FOR IMPLEMENTATION THROUGH SINGLE PACKAGE ON EPCC MODE AND LSTK BASIS.
  • EPCM SERVICES FOR IMPLEMENTATION THROUGH MULTIPLE PACKAGE ON ITEM RATE.
  • DEVELOPMENT OF CONSTRUCTION DRAWINGS.
  • DEVELOPMENT OF FABRICATION DRAWINGS.
  • DEVELOPMENT OF 3D MODEL AND EXTRACTION OF DRAWINGS WITH BOM.
  • PROJECT MANAGEMENT.
  • CONSTRUCTION MANAGEMENT.
  • MECHANICAL COMPLETION CHECK-UP.
  • PRE-COMMISSIONING CHECK-UP.
  • COMMISSIONING AND DEMONSTRATION PGRT.
  • PROJECT COMPLETION DOCUMENTATION.
UTILITY HANDLING SYSTEM

FIRECON has designed and implemented following facilities:

  • PLANT AIR GENERATION AND DISTRIBUTION SYSTEM WITH HOSE STATION.
  • INSTRUMENT AIR GENERATION AND DISTRIBUTION SYSTEM.
  • PROCESS WATER SYSTEM WITH FILTRATION PLANT AND DISTRIBUTION SYSTEM.
  • SERVICE WATER SYSTEM WITH FILTRATION PLANT AND DISTRIBUTION SYSTEM.
  • DRINKING WATER SYSTEM WITH RO PLANT AND DISTRIBUTION SYSTEM.
  • NITROGEN SYSTEM STORAGE, VAPORIZER, DISTRIBUTION PIPELINE FOR PURGING DURING MAINTENANCE AND COMMISSIONING.
  • LOW PRESSURE STEAM SYSTEM WITH DISTRIBUTION PIPING AND HOSE STATION.
  • SECURITY AIR SYSTEM WITH BUFFER AIR CHAMBERS.