| Contact No. | Owner | Details of job |
|---|---|---|
| C481 | IPPL | A dedicated Security Air System for the LPG Terminal at Haldia (West Bengal) inclusive of Security Air Compressor, Security Air Piping including Buffer Air Chamber and integration with Deluge Valves for Hydro pneumatics balancing |
| C500 | IOCL | Propylene Handling System for Oxo-Acrylic Project comprising of unloading of Road Tankers through Propylene Compressor System, Propylene Storage (Mounded Bullets) and Pumping System to ‘A-A’ Unit and NBA Unit. Process Safety System comprised of Hydrant / Monitor System, MVWS System automatically actuated through Q.B. Detectors, Gas Detection System, ESD System, Fire Detection cum Alarm System and CCTV System and integrated with DCS & PLC SIL-3 Certified along with Blast Resistance Control Room. |
| C506 | ONGC | LPG Handling System comprising of LPG receipt from the Gas Processing Complex, storage in Mounded Bullets and Pumping System for Rail Wagon Loading, Road Tanker Loading & Pipeline Transfer System. Process Safety System comprised of Fire Hydrant / Monitor System, MVWS System automatically actuated through Q.B. Detectors, Gas Detection System, Flame Detection System, ESD System, Fire Detection cum Alarm System and CCTV System and integrated with Process PLC & Safety PLC SIL3 Certified & Substation. |
| C508 | IOCL | Propylene / LPG Handling System comprising of receipt through Pipeline, storage (2 Mounds having 4 Vessels each) and Pumping System for Propylene Transfer to Polypropylene Plant and LPG Transfer through Cross-country Pipeline. Process Safety System comprised of Fire Hydrant / Monitor System, MVWS System automatically actuated through Q.B. Detectors, Gas Detection System, Flame Detection System, ESD System, Fire Detection & Fire Suppression System and CCTV System integrated with DCS & PLC. |
| C509 | HPCL | Unloading of POL Product from Rail Wagons at IRD and transfer to Aboveground Storage Tank through Pumping System and transfer to Road Tanker Loading Gantry through Pumps with related Piping & Instruments. Process Safety System comprised of Fire Hydrant / Monitor System, Medium Velocity Water Spray System manually actuated. |
| C520 | IPPL | Process Engineering for ambient Air Heating of Refrigerated Propane & Butane for Producing LPG through Air Heaters, Control Valves, various type of Transmitters and SIL3 Certificated PLC. Process Safety System comprised of Fire Hydrant / Monitor System, Medium Velocity Water Spray System automatically actuated through Q.B. Detectors in existing LPG Terminal. |
| C532 | HPCL | HPCL decided to augment existing facility necessitating construction of additional facility in existing Plant. FIRECON was responsible for Design & Engineering of Civil & Structural facilities. |
| C533 | HPCL | Additional storage (2 x 500 MT) Mounded Bullet and LPG Bulk Tanker Loading Facility in existing Bottling Plant complete with Piping, Pumping, related Electrical & Instrumentation System as well as Process Safety System comprised of Fire Hydrant / Monitor System, Medium Velocity Water Spray System automatically actuated through Q.B. Detectors. The Plant is also provided with state of the art, Instrumentation cum Terminal Automation System. |
| C542 | HPCL | Additional storage (1 x 500 MT) and unloading from Rail wagons which necessitated modification in Piping arrangement as well as Fire Protection System in existing LPG Bottling Plant complete with Hydrant / Monitor System and Automatically Actuated MVWS System. |
| C551 | BPCL | Development of Hydraulic Node Diagram and carrying out Hydraulic Analysis in PIPENET Software for validation of existing Fire Water Network sizes of existing Bottling Plant for compliance with OISD-144. |
| C560 | HPCL | Development of Hydraulic Node Diagram and carrying out Hydraulic Analysis in PIPENET Software for validation of existing Fire Water Network sizes of existing Bottling Plant for compliance with OISD-144. |
| Contact No. | Owner | Details of job | Target Date for Completion |
|---|---|---|---|
| C522 | HPCL | LPG TERMINAL at BARMER, Rajasthan | Commissioning in progress |
| C523 | HPCL | LPG BOTTLING PLANT &TERMINAL WITH RAIL WAGON UNLOADING SYSTEM at KAMARDANGA, Assam | Construction nearing completion |
| C526 | HPCL | LPG BOTTLING PLANT & TERMINAL with RAIL WAGON UNLOADING SYSTEM at MADURAI, Tamilnadu | Engineering in Progress |
| C539 | IOCL | FIRE DETECTION, ALARM and PROTECTION SYSTEM for POL RAIL LOADING GANTRY, AT BARAUNI Refinery, Bihar. | Engineering Completed, Erection in Progressing |
| C540 | ADANI | ROAD TANKER LOADING FACILITY with TERMINAL AUTOMATION SYSTEM for LPG TERMINAL, MITHIROHAR, Gujarat. | Engineering Completed, Erection in Progress |
| C545 | BPCL | CONSTRUCTION OF ROAD FED POL DEPOT, AT PASIGHAT, Arunachal Pradesh | Engineering Completed, Construction in Progress. |
| C547 | BPCL | MINI LPG BOTTLING PLANT, MATIA, Assam | Engineering Completed, Construction in Progress. |
| C549 | HPCL | LPG BOTTLING PLANT with 12 POINT CAROUSAL AND MOUNDED BULLETS AS PER OISD 169 & 150, AT NAJIBABAD, UTTAR PRADESH. | Engineering nearing completion, Construction in Progress. |
| C550 | ADANI | LPG RAIL WAGON LOADING GANTRY INSIDE MUNDRA PORT, MUNDRA, Gujarat | Engineering in Progress |
| C552 | URBANA | REPLACEMENT OF LPG SUPPLY LINE AT ALL TOWERS AREA – URBANA PROJECT, Kolkata, West Bengal | Engineering Completed, Construction in Progress. |
| C553 | IOCL | EPMC & ALLIED SERVICES FOR TLF REVAMPING JOB – MALDA DEPOT, West Bengal | Engineering nearing completion, Construction in Progress. |
| C554 | BPCL | CIVIL WORK RELATED TO MOUNDED BULLET – THANJAVUR, Tamil Nadu | Engineering nearing completion. |
| C556 | HPCL | REVAMPING OF ROAD TANKER LOADING FACILITY AND CAPACITY AUGMENTATION OF LUBE OIL BLENDING PLANT, AT MAZGAON, MUMBAI, MAHARASHTRA | Engineering in Progress |
| C557 | ADANI | OBTAINING CTE & CTO ALONG WITH STORAGE LICENSE FROM PESO FOR FUEL MANAGEMENT SYSTEM, AT IMPORT TERMINAL, MUNDRA, GUJARAT. | Document submitted to PESO for Approval (CTE). |
| C558 | HPCL | EXPANSION OF LUBE OIL BLENDING PLANT FOR STORAGE, BLENDING, FILLING & WAREHOUSING FACILITIES FOR LUBE OIL BLENDING PLAT, AT SILVASSA, UNION TERRITORY OF DADRA AND NAGAR HAVELI AND DAMAN AND DIU. | Engineering in Progress. |
| C561 | BPCL | DESIGN OF MOUNDED BULLET FACILITY (TO HOUSE: 4 X 150 MT BULLET) FOR LPG BOTTLING PLANT, AT CHITRADURGA, KARNATAKA | Order received, Engineering commenced |
| Contact No. | Owner | Details of job | Target Date for Completion |
|---|---|---|---|
| C541 | NEW GAS | LPG BOTTLING PLANT of 120 TMTPA Capacity at OBUASI ASHANTI REGION, ACCRA, Ghana. | Basic Engineering Completed. |
| C555 | FAB -TECH | IMPLEMENTATION OF PROPANE TERMINAL, AT RAS AL KHAIMAH - RAK (UAE). | Concept Engineering details finalised, Job under ‘HOLD’. |
| C559 | TECHNICON | REVAMPING OF ALA AVIATION FUEL STORAGE FACILITY REVAMPING PROJECT, AT ALMATY INTERNATIONAL AIRPORT, - ALMATY, KAZAKHSTAN | Concept Engineering details finalised. Job under ‘HOLD’ because of WAR. |